Test catalogue
Genetic tests available for sample collection at our units. Search by test name or gene, and filter by specialty.
This list is indicative: the availability and turnaround time of each test should be confirmed with the unit before collection. Results should always be interpreted by your doctor.
Results
488 tests · Page 11 of 17
Isolated growth hormone deficiency type IB (GHRHR gene, NGS)
Code 10557 · Next-generation sequencing (NGS)
Genes: GHRHR
Turnaround time: 33 working days
Joubert syndrome type 7 (RPGRIP1L gene, NGS)
Code 11062 · Next-generation sequencing (NGS)
Genes: RPGRIP1L
Turnaround time: 33 working days
Kabuki syndrome (2-gene panel, NGS)
Code 11067 · Next-generation sequencing (NGS)
Genes: KDM6A, KMT2A
Turnaround time: 33 working days
Kabuki syndrome (KDM6A gene, NGS)
Code 11066 · Next-generation sequencing (NGS)
Genes: KDM6A
Turnaround time: 33 working days
Kabuki syndrome (KMT2D gene, NGS)
Code 11065 · Next-generation sequencing (NGS)
Genes: KMT2D
Turnaround time: 33 working days
Karyotype of peripheral blood lymphocytes
Code 3004 · Cytogenetic analysis
Genes: Cariótipo
Turnaround time: 13 working days
Karyotype of tissue fibroblasts
Code 3008 · Cytogenetic analysis
Genes: Cariótipo
Turnaround time: 25 working days
Klippel-Feil syndrome (5-gene panel, NGS)
Code 11071 · Next-generation sequencing (NGS)
Genes: GDF3, GDF6, MEOX1, MYO18B, RIPPLY2
Turnaround time: 33 working days
Large deletion/duplication testing (1 gene, NGS, CNVs)
Code 3441 · Next-generation sequencing (NGS) + CNVs
Turnaround time: 30 working days
Laron syndrome (GHR gene, NGS)
Code 11076 · Next-generation sequencing (NGS)
Genes: GHR
Turnaround time: 33 working days
Larsen syndrome (FLNB gene, NGS)
Code 11077 · Next-generation sequencing (NGS)
Genes: FLNB
Turnaround time: 33 working days
LEOPARD syndrome (PTPN11 gene, NGS)
Code 11079 · Next-generation sequencing (NGS)
Genes: PTPN11
Turnaround time: 33 working days
LEOPARD syndrome (RAF1 gene, NGS)
Code 11080 · Next-generation sequencing (NGS)
Genes: RAF1
Turnaround time: 33 working days
Leri-Weill dyschondrosteosis (LWD) SHOX (SHOX gene, NGS)
Code 10649 · Next-generation sequencing (NGS)
Genes: SHOX
Turnaround time: 33 working days
Lissencephaly (21-gene panel, NGS)
Code 11109 · Next-generation sequencing (NGS)
Genes: ACTB, ACTG1, ARX, ATP6V0A2, CDK5, DCX, FKTN, ISPD and 13 more
Turnaround time: 33 working days
Lissencephaly (PAFAH1B1 gene, NGS)
Code 11106 · Next-generation sequencing (NGS)
Genes: PAFAH1B1
Turnaround time: 33 working days
Lissencephaly (RELN gene, NGS)
Code 11105 · Next-generation sequencing (NGS)
Genes: RELN
Turnaround time: 33 working days
Lissencephaly (TMTC3 gene, NGS)
Code 10184 · Next-generation sequencing (NGS)
Genes: TMTC3
Turnaround time: 33 working days
Loeys-Dietz syndrome (6-gene panel, NGS)
Code 11112 · Next-generation sequencing (NGS)
Genes: SMAD2, SMAD3, TGFB2, TGFB3, TGFBR1, TGFBR2
Turnaround time: 33 working days
Loeys-Dietz syndrome (TGFBR1 gene, NGS)
Code 11111 · Next-generation sequencing (NGS)
Genes: TGFBR1
Turnaround time: 33 working days
Loeys-Dietz syndrome (TGFBR2 gene, NGS)
Code 11110 · Next-generation sequencing (NGS)
Genes: TGFBR2
Turnaround time: 33 working days
Mahvash disease (GCGR gene, NGS)
Code 3516 · Next-generation sequencing (NGS)
Genes: GCGR
Turnaround time: 33 working days
Mandibulofacial dysostosis (EFTUD2 gene, NGS)
Code 10663 · Next-generation sequencing (NGS)
Genes: EFTUD2
Turnaround time: 33 working days
Marfan syndrome (3-gene panel, NGS)
Code 11117 · Next-generation sequencing (NGS)
Genes: TGFBR1, TGFBR2, FBN1
Turnaround time: 33 working days
Marfan syndrome (FBN1 gene, NGS)
Code 11115 · Next-generation sequencing (NGS)
Genes: FBN1
Turnaround time: 33 working days
Marshall-Smith syndrome (NFIX gene, NGS)
Code 11118 · Next-generation sequencing (NGS)
Genes: NFIX
Turnaround time: 33 working days
McCune-Albright syndrome (GNAS gene, NGS)
Code 11119 · Next-generation sequencing (NGS)
Genes: GNAS
Turnaround time: 33 working days
Meckel syndrome (13-gene panel, NGS)
Code 11121 · Next-generation sequencing (NGS)
Genes: B9D1, B9D2, CC2D2A, CEP290, KIF14, MKS1, NPHP3, RPGRIP1L and 5 more
Turnaround time: 33 working days
Megalencephaly, polymicrogyria, postaxial polydactyly, hydrocephalus (AKT3 gene, NGS)
Code 10070 · Next-generation sequencing (NGS)
Genes: AKT3
Turnaround time: 33 working days
Menkes syndrome (ATP7A gene, NGS)
Code 11120 · Next-generation sequencing (NGS)
Genes: ATP7A
Turnaround time: 33 working days